產品資訊
Acrylic Court
■ Features
1. Excellent anti-slip characteristic.
2. Excellent abrasion resistance.
3. Durability, attractive appearance.
4. Durability, attractive appearance.
■ Usages
Courts:Tennis court, badminton court, basketball court, volleyball court and handball court.
Others:Running track, aisles and parking lots etc.
|
■ Surface preparation: |
|||||||
| ( a ) | Prior apply the Acrylic court coating material to the surface, the surface should be flooded with water to make sure the surface is leveled and marked any uneven area. | ||||||
| ( b ) | After the marked area is completely dry, apply the primer and patch binder until leveled. Apply the primer and patch binder until leveled after the marked area is completely dry. | ||||||
| ( c ) | All cracks should be patched the same as procedure (2). | ||||||
| ■ Priming: | |||||||
| ( a ) | Asphalt base: depends on the condition of the substrate. | ||||||
| ( b ) | Concrete base: apply with AC Primer. | ||||||
| ( c ) | Allowed to cure for 2 hours before next application. | ||||||
| ■ Court patch binder: | |||||||
| ( a ) | Construction time: | ||||||
|
|||||||
| ( b ) | Instruction: | ||||||
|
|||||||
| ■ Acrylic color resurfacer: | |||||||
| The color resurfacer is available in green and red color. | |||||||
| ( 1 ) | All lines must be masked prior to painting. Generally apply green color to the inside court and red color to the outside court. | ||||||
| ( 2 ) | Dilute with water and stir thoroughly. | ||||||
| ( 3 ) | Apply this material by spatula or trowel and allowed to dry for 3 hours. | ||||||
| ■ Color finish: | |||||||
| ( a ) | The residues must be cleaned up prior to next application. | ||||||
| ( b ) | Dilute with 20% water and stir it thoroughly prior to application. Apply by squeegee or roller. | ||||||
| ( c ) | Allowed to dry for 60 minutes to apply the second coat. | ||||||
| ■ Line marking: | |||||||
| ( a ) | All lines should be accurately located and marked in accordance with the courts standard. All lines should be taped. | ||||||
| ( b ) | All lines should be painted with weather resistance line marking paint. | ||||||
| ( c ) | Remove masking tape within 1 hour. | ||||||
| ( d ) | Allowed to cure for 24 hours | ||||||
| ■ Asphalt base: | |||||||
| ( a ) | Thickness of new asphalt or concrete substrates should be 5~7 cm. | ||||||
| ( b ) | The new asphalt should be well compacted and smooth on. Ensure the slope of drainage. | ||||||
| ( c ) | Must be cured for at least 10 days before application of acrylic court coating material. | ||||||
| ( d ) | Any defects on the old asphalt base should be patched with court patch binder. Allow to fully cure before next application. | ||||||
| ■ Concrete base: | |||||||
| ( a ) | The new concrete should be compacted and smooth on. | ||||||
| ( b ) | New concrete surface should be reinforced and roughened. | ||||||
| ( c ) | New concrete should be fully cured for a minimum of 20 days. | ||||||
| ( d ) | Surface should be roughened before application. | ||||||
| ( e ) | Due to the concrete base has uncertain alkali, do not apply with Acrylic island green system over it. | ||||||
| ■ Aapplication profile: | |||||||